top of page
20220615_MSREngenharia_Nexteer_036.jpg

Nexteer Factory

Industrial Buildings in Porto Alegre

Execution by Works Contract

Client

Nexteer Automotive

Year

2019

 

Architectural project

AT Arquitetura

 

 

 

 

 

Nexteer's work is a big improvement of infrastructure in a traditional multinational company.

The main benefit of this project is the well-being of employees. The cafeteria and changing rooms in one block and the administrative building with two floors in a second block will be qualified.

The architecture is inspired by the original design of the factory, with natural lighting sheds. In the current proposal, these elements are used in a new and contemporary language, with use of materials such as metallic structure, exposed blocks and tile coating.

It was a challenge where MSR participated actively since the competition stage, proposing engineering solutions to make the project economically viable, balancing the aspects of economy, aesthetics, sustainability and durability.

 

20200508_110848.jpg
PHOTO-2021-03-19-12-47-58.jpg

Nexteer's work is a big improvement of infrastructure in a traditional multinational company.

The main benefit of this project is the well-being of employees. The cafeteria and changing rooms in one block and the administrative building with two floors in a second block will be qualified.

The architecture is inspired by the original design of the factory, with natural lighting sheds. In the current proposal, these elements are used in a new and contemporary language, with use of materials such as metallic structure, exposed blocks and tile coating.

It was a challenge where MSR participated actively since the competition stage, proposing engineering solutions to make the project economically viable, balancing the aspects of economy, aesthetics, sustainability and durability.

 

PHOTO-2021-03-19-12-53-32.jpg
protenção.jpeg
20200508_110734.jpg
bottom of page